" APC is commited to excellence in their continuous development program, always seeking out new production methods and technologies that help will provide the very best"
Early 2007 saw APC move their office and production facility to Monarto in South Australia to provide room for greater expansion and the ability to progress into more diversified areas of service and engineering, together with a more centralised service distribution point to service all areas of the Australian continent.

APC continues to develop its facilities to provide a complete service where everything is taken care of as a comprehensive service package.
      
Australian Portable Camps
Accommodation and Camp Specialists
APC is committed to excellence in their continuous development program, always seeking out new production methods and technologies that help will provide the very best and latest in camp and support solutions.

2009 has seen APC produce the first Class 3 BCA compliant accommodation buildings on a purpose created manufacturing production line. 
Monarto Developments
Production line #1 and # 2 are currently in operation.

Click Here to read more about the current development at Monarto.
Latest Developments
A Commitment to Excellence
Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments
Multi-Storey Accommodation
Coil Slitting Plant
Kitchen Re-furbishing
Roll-form plant
Production line #1 in operation
APC Monarto
APC Monarto Office and Carpark
New plant being installed
Monarto Developments Monarto Developments Monarto Developments Monarto Developments
Shed 4 & 2 being completed
Lifting panels on Production line #1
Monarto Developments
Safety training facilities
An "All in One" Solution
Current production facilities at APC's Monarto production site include:

Camp building production
Panel manufacture
Automatic Roll-forming
Generators
Engineering
Mechanical
Electrical
Waste water treatment
Potable water plant.

For more details on APC's production and manufacturing facilities visit our Facilities and Manufacturing pages or contact us via the details on the Contact Us page.
Current Developments

Sheds 2 & 4
Shed 2 is having plant installed for 2 robotic welding assembly lines being installed for automatic production of our building chassis and assembly of roof components.

Shed 4 is nearing completion with a floor space of over 4500 square meters.  With state of the art technology, our unique automatic floor panel plant allows APC to produce strong large floor panels with high thermal ratings, and high fire and termite resistance. A new fibreglass workshop provides facilities for the production of bathroom and shower components.  Automated cabinet and furniture making assembly lines complement the well laid out workshop floor.

Shed 3
The production assembly line shed (No. 3) is having plant installed.  Our largest shed with over 5000 square meters of floor space houses our 2 roll-on assembly lines. The first machines to be installed were the floor panel press.  The extremely well planned assembly lines are equipped with 3 overhead gantry cranes and all the necessary equipment for fast, easy and safe operation enabling APC to manufacture 36 to 40 complete rooms each day on a normal shift.  Kitchens and wet-mess can now be produced within 2-4 weeks from the date of order supported by APC's stock of catering and refrigeration equipment.

Production line #1 and line #2 are now in operation.

Shed 5
The Southern end of the store, shed 5 has been completed as the heavy machinery service operations area for trucks and plant and is currently in full use.

APC - Since 1988
Retail Sales
A new retail area is being developed where retail items and services will be available over the counter. Visit our Retail web page information about the retail items available.
Multi-Storey
Development continues with Multi-storey accommodation buildings.
All new APC camp buildings will feature the latest design for stackable multi-storey erection.  The ability to use any of our new buildings as multi-storey camps is a standard option that is provided at no extra unit production cost.

Production of multi-storey accommodation buildings require newly engineered and patented design base frames and corner/side supports.  Manufacture of the wall and ceiling panels is being automated so that these panels are produced by a patented system as a fully integrated single unit including all insulation, wiring and other services.

The capacity for APC to provide roll forming increases our production rate and quality control as well as an increase in building strength and R value to meet cyclonic conditions (W99) and Class 3 ABS conditions.

Manufacture of new accommodation and service buildings as well refurbishment of buildings returned from completed projects or buildings needing an upgrade.  APC's constant development program ensures that each building is manufactured with the latest techniques and facilities.

Manufacturing Services
Installation of new plant for our manufacturing section continues.

New Electrical Generators for APC Camps
APC has taken delivery of new generators that are available for camps.
Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments
New guilotines and manufacturing plant being installed and one of the new electrical generators
Automated panel cutter
Cabinet making workshop
APC Monarto carpark and main offices viewed from the West.
APC Monarto viewed from the East travelling through Monarto South along Ferries McDonald road.
APC Monarto central panorama view of main complex showing sheds 3,4,5 & 6.
Cutting cabinet panels
Safety
APC has specialised rooms for the training of employees in occupational health and safety.